REFERENCE 01
Original plan
Run a controlled disruption to check whether the plan still works.
MISSION SYSTEMS / CONTROLLED TEST RANGE
Repair the remaining mission plan without changing actions already completed.
02 / MISSION SCHEDULE
| Plan | From | Depart | To | Arrive | Cost | Status |
|---|
03 / ACTION LOG
| Step | Mission action | Depart | Arrive | State | Transfer cost | Cumulative |
|---|
04 / DECISION SUPPORT
REFERENCE 01
Run a controlled disruption to check whether the plan still works.
REFERENCE 02
Finds the lowest-cost remaining plan, allowing future actions to change.
CANDIDATE 03
Keeps the next protected action where possible, then checks the plan independently.
05 / INDEPENDENT CHECKS
Candidate checks appear here after a repair run.